Overview
Lodha Sadahalli
Overview
Lodha Sadahalli
Overview
Lodha Sadahalli
Overview
Photo: Lodha Beaumont Estate, Tharabanahalli| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | – |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 3 | – | |
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| 2 Oakland EstatesFiled as completed · no completion certificate on record | DEAMANTE PROPERTIES | Plot | ~1,500 sqft (estimate: filed carpet plus 25%) | Aug 2022 |
| AamayaActive · 7% built | SRK INFRA PROJECTS PRIVATE LIMITED | Plot | ~7,780–16,060 sqft (estimate: filed carpet plus 25%) | Jan 2029 |
| Aarohana AdiraActive · 5% built | AAROHANA PROJECTS | Apartment | 776–1,745 sqft carpet (as filed) | Dec 2030 |
| Abhi HomesExtended to 30-12-2026 | ABHI DEVELOPERS | Apartment | – | Dec 2026 |
| Adarsh Savana Phase 1Lapsed · completion date passed | SHRESHTA INFRA PROJECTS PRIVATE LIMITED | Plot | – | Oct 2023 |
| Adarsh Savana Phase 2Registered · no quarterly update yet | ALEKHYA PROPERTY DEVELOPMENTS PVT LTD. | Plot | ~1,200–3,190 sqft (estimate: filed carpet plus 25%) | Jun 2029 |
| Aditya Palm GroveApplied for completion 05/12/2019 | SRI ADITYA HOMES PRIVATE LIMITED | Plot | – | Dec 2019 |
| Aero ExoticLapsed · completion date passed | LOTUS ENCLAVE | Plot | ~1,200–1,530 sqft (estimate: filed carpet plus 25%) | Dec 2023 |
8 of 293 other projects in Devanahalli, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Lodha Sadahalli in the interactive atlas
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
Map of 4 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Sattva City, price locked; Godrej MSR City, price locked; Sattva Vasanta Skye, price locked; Sattva Vasanta Cove, price locked.
| Sattva City | 1.6 km | Locked | |
|---|---|---|---|
| Godrej MSR City | 2.9 km | Locked | |
| Barca II At Godrej Msr City | about 3 km | Locked | |
| Sattva Vasanta Skye | 3.6 km | Locked | |
| Sattva Vasanta Cove | 3.8 km | Locked | |
| Birla Trimaya Phase-2 | about 4 km | Locked | |
| Birla Trimaya Phase-3 | 4.2 km | Locked | |
| Varnam Phase 1c | about 4.5 km | Locked | |
| Birla Trimaya | about 4.5 km | Locked | |
| Riviera Glade | about 4.5 km | Locked | |
| Aeropolis, A Project Of Sattva Group | about 5 km | Locked | |
| Sobha Oakshire Phase 1 Wing 1,2,7 And 8 | about 7 km | Locked |
| Lodha Sadahalli This project | This project is the point the others are measured from | – | – | Not verified yet |
|---|---|---|---|---|
| Sattva City | 1.6 km | 28 Feb 2032 | 17% (425 of 2,491) | Locked |
| Godrej MSR City | 2.9 km | 31 Mar 2030 | 100% (1,957 of 1,961) | Locked |
| Barca II At Godrej Msr City | about 3 km | 31 Dec 2030 | 99% (593 of 602) | Locked |
| Sattva Vasanta Skye | 3.6 km | 6 May 2031 | 28% (301 of 1,077) | Locked |
| Sattva Vasanta Cove | 3.8 km | 27 Dec 2030 | 14% (28 of 200) | Locked |
| Birla Trimaya Phase-2 | about 4 km | 20 Jun 2029 | 99% (470 of 473) | Locked |
| Projects within 4 km, counted | 29 (16 with an approximate location) | |
|---|---|---|
| Flats in them | 16,681 | |
| Booked | 10,607 of 16,681 (64%) | |
| Unsold | 6,074 | |
| Booked a month, pooled | 276 flats | |
| Months to sell, pooled | 19 months |
Map of the ground within about 450 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | 71% Agriculture, 21% Vacant / wasteland | Review |
|---|---|---|
| Nearest high-tension line | A 400 kV line crosses the site, its corridor taking about 9% (about 25,830 m²), with 4 transmission towers standing inside the outline | Review |
| Nearest government-flagged flood location | 9.7 km, Kondappa layout |
| Nearest storm drain | 350 m to the south-east, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 260 m to the south, an unnamed pond |
| K-RERA registrations under this promoter | 9 | |
|---|---|---|
| Marked completed | 0 | |
| Past promised date, not completed | 0 | |
| Revoked or withdrawn | 1 |
Map of storm drains, lakes and government-flagged flood locations within about 450 m of the site.
Ten-year July mean for this taluk: 32.6 m
Taluk average; not a reading at the site.
| Groundwater | Yelahanka taluk average, July 2023: 11.4 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 1 CGWB wells in Yelahanka taluk read in this class | |
| Through the year | January 2025: 3.8 m (1 well), Pre-monsoon 2025: 3.4 m (1 well), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Yelahanka taluk (the median where there are several) | |
| Nearest city water main | 5.4 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 350 m to the south-east, tertiary drain | |
|---|---|---|
| Ground level | 907 m above sea level, plus or minus 4 m | |
| Metro, operational | 20.3 km, Peenya | |
| Metro, under construction | 1.7 km, Doddajala |
| Kempegowda Airport | 10.5 | 13 | 8.4 |
| MG Road (CBD) | 28.6 | 30 | 24.1 |
| Manyata Tech Park | 23.8 | 26 | 16.2 |
| ITPL, Whitefield | 40.5 | 42 | 25.6 |
| Ecospace, Bellandur ORR | 44.2 | 51 | 30.0 |
| Electronic City Ph 1 | 48.5 | 54 | 39.4 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | 900 m to the north-east | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 990 m to the south-east |